Nuclearn Request a meeting
New build For reactor developers

You build the reactors.
We handle the compliance.

Stand up the corrective action, quality and licensing programs a new plant needs without building each one in-house. Nuclearn's AI speeds up your analysts, and your engineers sign.

  • Corrective action program. Run it yourself on CAP AI, or have Nuclearn run your CAP as a managed service, under your license and QA program. The records stay yours.
  • Licensing. PSAR sections drafted from your design documents, the regulations and your prior submittals. The language you've already submitted is kept, and changes are logged.
  • Procedures and quality. Drafted on your own templates and kept the same across designs, with each draft linked to the documents it came from.

Start with one program: your CAP, or one PSAR chapter. Single-tenant, hosted by Nuclearn and set up for 10 CFR Part 810. Security and compliance →

Request a meeting

Pick a time on the calendar

or send a request

Tell us a little about your site and we'll set up a time.

Which product? (optional)

Nuclearn uses these details to reply to your request. Privacy Policy.

Prefer email? contact@nuclearn.ai

From reactor developers

Programs built on the platform, not by hand.

Weeks → days
PSAR section drafting

An SMR vendor drafts PSAR sections in days, not weeks, with an AtomAssist workflow that gathers the regulatory requirements and keeps its prior submittal language.

2 designs
One way to draft procedures

An SMR vendor drafts procedures the same way for two procedure types and two reactor designs. The second design was set up on the platform, not rebuilt.

Outcomes from individual Nuclearn customers, not named here. Results depend on the program and its documents.

In the products

Your analysts move faster. Your engineers sign.

Engineering AI with a request for proposal and a report template attached: the chat shows the review report being drafted, and the Generated Report panel shows page one of the Word report, with citations to the request and to Regulatory Guide 1.192.
Engineering AI on a demo request and a public NRC regulatory guide.

Drafted on your template, cited to the source.

Attach the request and your template. The draft comes back in Word, with numbered citations to the documents and guidance it used, for your engineers to check and sign.

A synthetic condition report record in CAP AI: its progress from Initiate through Screening, tabs for report details, screening, actions, discussion and history, the owner-group assignment, and the report as written.
A synthetic condition report in CAP AI.

A corrective action program before you have the people to run it.

Condition reports written in plain words and screened against your own codes, with the reasons shown, then followed through their actions and history in one record.

Start with one program →