Nuclearn Book a demo

Nuclear AI + Nuclear Expertise

Keep the Fleet Running. Clear the Backlog Behind It.

Nuclear plants need more than twice as many people per megawatt as any other source of generation, and much of that time goes to screening, documentation and review. Nuclearn pairs the industry's leading nuclear AI platform with customization services and fully outsourced functions, so your plants keep their standards with the people you have.

In use at more than 70 facilities across North America and the U.K. Operating plants use Nuclearn for CAP screening, 50.59 dispositions, engineering evaluations and the records work behind them.
Read stories from the field →

The staffing gap

The most reliable power on the grid is also the most labor-intensive to run.

Nuclear's staffing cost is not in the reactor. It is in the paperwork that keeps the reactor licensed, and in the people retiring who know how to do it.

More than twice the people per megawatt of any other generation source.

Every condition report screened, every 50.59 evaluated and every replacement part qualified is skilled work done by hand. As experienced staff retire, the same work falls on fewer people.

Nuclearn takes on the repeatable part of that work, so the people you have spend their time on the judgment calls.

2×+
employees per megawatt at nuclear plants, compared with any other source of generation. Source: U.S. DOE Energy and Employment Report (USEER) and EIA generating capacity.

Backlogs that grow

Condition reports, engineering evaluations and document reviews arrive faster than a lean team can close them.

Knowledge that retires

Decades of plant history live in records and in people. When people leave, the records have to answer the questions.

Cost per megawatt-hour

Fleet economics depend on running existing plants with fewer hours per task, without lowering the standard of the work.

How we work with utilities

A platform, the services to fit it, and the option to hand off the whole function.

Start where your team needs help most. Move up when you are ready, on the same platform.

LEVEL 1

The AI platform

AtomAssist and specialist tools for CAP, 50.59, engineering, equipment, parts and work management, with every answer tied to its source. Connects to Maximo and SAP.

LEVEL 2

Customization services

Workflows built on your templates, procedures and screening criteria, by nuclear engineers. The Pro tier adds AI models trained on your plant's own records.

Fully outsourced
LEVEL 3

Managed functions

Hand off a full function, such as CAP-as-a-Service, and Nuclearn runs it to your program's standards. Your team keeps the decisions and the oversight.

See it in action

Short product walkthroughs. Pick the one closest to your work.

AtomAssist

Cited answers, research and drafts for the whole plant.

CAP AI

Condition scoring, prioritization, and trending.

Equipment AI

Real-time alarm diagnosis and prevention.

Parts AI

Qualified parts sourcing with status tracking.

Where it helps

Start with the work that drives your operational backlog.

CAP screening

Consistent screening, coding and trending of condition reports, with the reasons shown for every call.

CAP screening →

50.59 disposition

Applicability, screening and evaluation drafted against your licensing basis, ready for qualified review.

50.59 disposition →

Engineering evaluations

Item equivalency, barrier and boric acid evaluations drafted on your own templates, with every input cited.

Item equivalency →

Equipment health

Equipment scored against its history and alarms, with the evidence behind each score.

Equipment AI →

Outages and work

Outage schedule risk and capital or expense tagging across the work order backlog.

Work AI →

Managed CAP

Let Nuclearn run the Corrective Action Program end to end, so your team keeps oversight and gets its hours back.

Ask about CAP-as-a-Service →
A synthetic condition report record in CAP AI: its progress from Initiate through Screening, tabs for report details, screening, actions, discussion and history, the owner-group assignment, and the report as written.
A synthetic condition report in CAP AI.
Engineering AI with a request for proposal and a report template attached: the chat shows the review report being drafted, and the Generated Report panel shows page one of the Word report, with citations to the request and to Regulatory Guide 1.192.
Engineering AI on a demo request and a public NRC regulatory guide.

Why Nuclearn

Three differences, built for how utilities work.

1

Full platform

A suite of AI tools, not a single application.

  • One platform across engineering, maintenance and compliance work
  • Integrates with Maximo and SAP
  • Part 810 compliant, ISO/IEC 27001:2022 certified
2

Domain expertise

Built by nuclear industry veterans.

  • Founded in 2021 by industry veterans
  • In use at more than 70 facilities across North America and the U.K.
  • Automates the work that drives operational backlogs
3

Customization

Fits how each plant and fleet works.

  • From tools to outsourcing a whole function, such as CAP as a service
  • Pro tier adds custom AI model training
  • Serves operating plants, reactor developers, and engineering and construction firms

“AI is only as valuable as the knowledge it can be trusted to deliver.”Jerrold Vincent, CFO and Co-Founder, Nuclearn

Let's Clear Your Backlog

Bring one task your team does every week, such as CAP screening or a 50.59, and we'll show it running on your own kind of records, with the source behind every answer.

Fill out the form to connect with our nuclear experts and talk through the platform, customization, or handing off a full function across your fleet.

Request a meeting

Pick a time on the calendar

or send a request

Tell us a little about your site and we'll set up a time.

Which product? (optional)

Nuclearn uses these details to reply to your request. Privacy Policy.

Prefer email? contact@nuclearn.ai